Each day, Clio connects thousands of people to nearby culture and history. Our website and mobile app are free for everyone and designed to make it easy to discover cultural and historical sites throughout the United States. You can search for nearby sites, take a walking tour, create your own itinerary, or simply go for a walk or drive and let Clio show you nearby sites using our mobile app. Clio is non-profit and free for everyone thanks to the support of people like you. Donations are tax- deductible! Click here to learn more!
Kanawha River Lock 9
Listen
The Kanawha River locks were built between 1875 and 1898 to allow steamboats to travel from Point Pleasant to Charleston. The locks were a series of ten low-lift wicket dams that contained one single-lock chamber. Lock 9 was completed in 1893 and allowed safe travel for steamships into Buffalo, and beyond the rapids at Red House to Charleston. It was located just outside of Buffalo and ruminates of the dam can still be seen. The dams were replaced in the 1930's by the U.S. Army Corps of Engineers with four high lift dams with German roller gates.Listen
Before the Kanawha locks
system was built, the river was treacherous for boat travel. Between Charleston
and Point Pleasant were ten separate rapids that caused numerous wrecks and the
loss of cargo/Lives. The rapids located at Scary Creek and Red House were the
most treacherous and was the direct cause for the locks to be built.
In 1820, Albert Donnally, built salt manufacturers
located along the Kanawha river, causing the increase in river traffic to
Charleston. Even after countless accidents ensued, the dams were not started
until 1870 upon the action of Congress.
The dams were made of Chanoine wickets which are timbers
that are bolted together to resemble a giant ironing board. These were bolted
to the foundations at the bottom of the river. Which can be raised and
lowered to create a dam in low water to increase the depth of the pools. They
also slowed down the flow of the river, and caused the rapids to
dissipate or slow down for safe travel up and down the river. The
individual wickets that make up the dam were raised and lowered by a crew on a
boat on the upstream face of the dam. A bar attached to the wicket would ride
in a groove in the foundation and as a grapple hook pulls up the wicket, the bar
slides up the groove into a niche. This locks the wicket into its upright
position and supports against the flow of the oncoming river. The dams
were completed in 1898 and were in service until their replacement in the
1930's by high-lift German roller gate dams.
Sources
"The Old Lock & Dam System On The Kanawha." mywvhome, www.mywvhome.com/1900s/locks.html. Accessed 2 May 2017.
Local Historian Interview "Mark Harris"
This entry has been viewed 151 times within the past year
Comments
Join The Discussion
Only registered users can comment. Registration is completely free!
Login / Register